Rozelle Interchange Project – Presentation and Q&A

EA Sydney Office Mezzanine Level, 44 Market Street, Sydney, New South Wales

Overcoming the complex geometry and geology during design and construction of the Rozelle Interchange tunnel network THURSDAY 1 AUGUST - REGISTRATION LINK NOW AVAILABLE! Rozelle Interchange was the final stage (Stage 3b) of the WestConnex project. As stated in the project title, ‘Interchange’, this project linked the M4 East and M4-M8 Link projects with [...]

Road tunnel ventilation optimisation using 1D modelling

Online

Overview This event offers invaluable insights into improving road tunnel ventilation systems. Hear first-hand from experts who collaborated with Australian road tunnel operators to enhance their ventilation using advanced simulation tools. Learn how Ventsim DESIGN, a 1D network flow simulation tool with a 3D graphical user interface, was adapted for tunnel-specific challenges like jet [...]

DAARWIN-GEMINI A novel tool to predict advance rate of a TBM in real-time

Online and in person at: Level 9, 340 Adelaide Street, Brisbane

Overview SAALG Geomechanics, in collaboration with ACCIONA, has developed DAARWIN-GEMINI, a software system designed to optimize the performance of tunnel boring machines (TBMs) using machine learning-based techniques. The system key features include an advanced architecture for querying and processing data from the TBM database, big data analysis and visualization in a web browser, a [...]

Geocomposite Tunnel Invert Drainage – Online technical presentation

Webinar

Presentation abstract: Cavidrain Invert geocomposite systems are used to form a drainage layer beneath the road pavement of tunnel floors. The use of Cavidrain Invert offers a number of advantages over more traditional methods (which use crushed stone and pipes) such as: (i) reduced excavation (as they form a much thinner layer compared to [...]

ITA Lecture – EPB tunnelling: environmental aspects and re-use opportunities of the conditioned muck

Online

The rapid development of mechanised tunnelling in the last decades has increased the tunnelling community’s focus on the environmental aspects of tunnel construction. The excavation carried out by using EPB (Earth Pressure Balance) machines often requires the use of foaming agents, specific products that are added to the medium intended to be excavated, in order [...]

Hobsons Bay main Yarra crossing duplication project

Melbourne Engineers Australia office

The Hobsons Bay Main Sewer (HBMS), constructed in the 1960s, transfers approximately 30 per cent of Melbourne’s wastewater to the Western Treatment Plan at Werribee. The sewer alignment has a single sewer crossing under the Yarra River, which has deteriorated to a point where it requires rehabilitation and/or replacement. The Hobson Bay main Yarra [...]

North East Link SEM Ventilation Tunnel and Adit Construction

Delve Underground Level 15 / 385 Bourke Street, Melbourne, Victoria

REGISTRATION DETAILS COMING SOON Overview The construction of the North East Link (NEL) tunnels is well underway! The largest transport infrastructure project in Victorian history consists of 6.5 km tunnels from Watsonia to Bulleen, and it will complete Melbourne’s orbital freeway network. The presentation will provide an overview of the recently constructed ventilation tunnel [...]

ATS technical session: Design of large underground caverns for pumped hydro projects

Online and in person at: Level 9, 340 Adelaide Street, Brisbane

Overview This webinar will be focused on the design of large underground caverns, a crucial topic with the current development of multiple Pumped Hydro schemes. The main speaker will be Mousa Hazrati Aghchai, who has a PhD in rock mechanics and a solid background in geotechnics/rock mechanics in Tunnelling, Hydropower, and Dam engineering with [...]

Ground freezing below a river estuary – Save the date

EA Brisbane Office Level 9, 340 Adelaide St (EA Office), Brisbane, Queensland

SAVE THE DATE - Registration details coming soon Overview A new 1.48km road tunnel has been excavated beneath the Świna straits in northwest Poland using a 13.46m slurry TBM. To overcome the challenges posed by low overburden and complex geology, artificial ground freezing was implemented to enable safe excavation for the emergency egress structures [...]