

Suburban Rail Loop East: Tunnels North Improving sustainability outcomes in tunnel design and construction
February 27 @ 5:30 pm - 7:00 pm AEDT
Overview
The first section of the Suburban Rail Loop, known as SRL East, is a fully underground 26 kilometre metro line in Victoria, stretching from Cheltenham in the south to Box Hill in the east. This segment will feature six stations.
New connections will be established with current heavy rail stations at Cheltenham, Clayton, Glen Waverley, and Box Hill, and new stations will be constructed at Monash and Burwood. Particularly, Clayton interchange is designed to be a major transport hub, linking regional travellers to Suburban Rail Loop. These six underground stations will be constructed 17 to 23 metres beneath the surface using a ‘bottom-up’ approach. The entrances to these stations will be conveniently located near existing train stations and key local facilities.
This joint presentation with Terra Verde JV, which was awarded contract for SRL East Tunnels North, Suburban Rail Loop Authority (SRLA) and Arup will cover progress updates on the work packageand sustainability design and initiatives adopted as part of the delivery phase of the project.
Event program – in person
• 5.30 pm AEDT: Networking and light refreshments
• 6.00 pm AEDT: Presentation commences with Q&A
• 7.00 pm AEDT: Presentation concludes
Event program – online
• 6.00 pm AEDT: Presentation commences with Q&A (see Teams Workshop link in your registration email)
• 7.00 pm AEDT: Presentation concludes
Speakers
- Chris Lyons
Deputy Package Director SRLA - Fabio Ciciotti
Project Director Terra Verde JV - Laurent Auvinet
Construction Director Terra Verde JV - Morgan Foster
Arup, Senior Sustainability Engineer