ATS QLD – Project Delivery of Bulimba Creek and Fotrose Rising Main Projects
August 8, 2019 @ 5:30 pm AEST
Joint the ATS and ASTT in a joint technical presentation on real-world lessons learned on Australian micro-tunnelling projects.
Delivered by Abergeldie’s Technical Director for Tunnelling, Grant Schultz, attendees will learn of the key takeaways from two local projects from end-to-end.
In his current role, Grant oversees all underground projects across Australia and New Zealand.
Throughout his presentation, Grant will share with you the works completed by Abergeldie in relation to the Bulimba Creek and Fortrose Rising Main Projects for QUU from time of tender, right though to design to project delivery.
Bulimba Trunk Sewer is a tunnel project involving a total of 3600m of 1800mm OD Tunnel which is installed using the Pipe Jacking Method. Within, the project had shafts up to 65m deep
and Single Drive lengths up to 853m long.
Fortrose Rising Main was a tunnel 46m under the Brisbane River. This tunnel is 560m long and was constructed using the Pipe Jacking method, also involving a compound curve alignment.
Date: Thursday 8 August 2019
Time: 5.30pm to 7.00pm
Venue: Hawken Auditorium, Engineering House, 447 Upper Edward St, Spring Hill QLD 4000
Cost:Free for Members & Students/$30 for Non-Members
Speakers: Grant Schultz
Session Contact: memberservices@engineersaustralia.org.au