ATS QLD – Design and Construction of NBAQ4 Water Transfer Scheme
September 12, 2019 @ 5:30 pm - 7:00 pm AEST
Join industry professionals for an informative technical presentation on the NBAQ4 project design to supply water to the people of Manila.
You’ll hear from GHD’s Tunnel Practice Leader and NBAQ4 Project Manager, Brendan Henry, for an insight into the NBAQ4 project and its design, implementation, considerations, and execution.
Based in the Philippines, the NBAQ4 project will provide water supply for around seven million residents of Manila and is a critical piece of water supply infrastructure for Manila Water Company Inc.
The scheme requires a new 3m diameter precast concrete lined tunnel 7.4km long, drive through very weak volcanic rock and soil. The TBM will be driven from the Balara WTP with an EPB TBM design to negotiate three, 80m-radius sections of the tunnel drive. The TBM will be driven into a new water intake structure in the La Mesa reservoir, and will dock there with the shield left in place.
The Intake is connected to shore by a 150m-long access bridge and is constructed within a 32m-deep steel pipe pile cofferdam with 30m head of water. The tunneling works are executed from a 55m long mined tunnel in very weak rock with soil like parameters and supported with forepoling, steel ribs and shotcrete.
The design has been completed by GHD across Philippine, Australian and UK offices with construction by NovaBala JV of CMC, Chun Wo and First Balfour.
Event assembly and light refreshments will take place prior to the presentation from 5.30 – 6.00pm. Following the presentation, there is designated time for open discussion and questions for the presenter.
Presenter Information
Brendan Henry – Tunnel Practice Leader & NBAQ4 Project Manager, GHD
With more than 25 years of civil engineering experience working as both contractor and consultant in four continents, Brendan is experienced in the planning, design and construction of tunnels, shafts and tunnel systems for road, rail, sewer, water and mines.
Hehasmanaged deliveryfor PPP,EPCM,D&Cand design only projects with multi-disciplined and multi-cultural teams. Brendan has in-depth experience as contractor and designer for high risk TBM tunnelling in urban environments and difficult, mixed ground conditions.
Date: Thursday 12 July 2019
Time: 5.30pm to 7.30pm
Venue: Hawken Auditorium, Engineering House, 447 Upper Edward St, Spring Hill QLD 4000
Cost:Free for Members & Students/$30 for Non-Members
Session Contact: memberservices@engineersaustralia.org.au